这是描述信息
/
/
4.5 Ton Four Post Lift
Search
zjh1
zjh2
zjh3
zjh4
zjh5
zjh6

4.5 Ton Four Post Lift

• Alignment kit equips with high strength steel balls, extend service life. • Flat runway. • Pneumatic unlock system, easy to operate. • Driven by hydraulic cylinders, transmission by wire rope, low noise. • Wire Rope fracture proof system , explosion proof devices of hydraulic system , more secure and reliable. • Second lift optional.
zjh1
zjh2
zjh3
zjh4
zjh5
zjh6
Product description
Product Information

 

This lift system's runways accommodate wide or narrow vehicles, have rail kits for adding optional accessories and are powered by a single hydraulic cylinder mounted underneath the runway. Item too large for lift gate. Requires forklift on site for unloading.

Product Parameters

Model

QJY4045-ZJ

Capacity

4.5 Ton

Min ground clearance

220 mm

Max ground clearance

1950 mm

Rise time

60 sec.

 Drop time

 20-40 sec.

Power of moter

2.2 kw

Power of supply

380V / 220V

Tabel  length

4400 mm

Tabel  width

500 mm

N.W./G.W.

1150/1190 kgs

1#Package size

4530x560x820 mm

2#Package size

900x280x320 mm

QTY/20.CY

8 PCS

 

Features

 

•  Alignment kit equips with high strength steel balls, extend service life.

•  Flat runway.

•  Pneumatic unlock system, easy to operate.

•  Driven by hydraulic cylinders, transmission by wire rope, low noise.

•  Wire Rope fracture proof system , explosion proof devices of hydraulic system , more secure and reliable.

•  Second lift optional.

 

Common Problems And Solutions

Sequence of Lockout Procedure

1) Notify all affected employees that a lockout is being performed for servicing or maintenance and that the lift must be shut down and locked out to perform the servicing or maintenance

2) Unload the subject lift (remove vehicle). Shut it down and assure the disconnect switch is "OFF" if one is provided on the lift.

3) The authorized lockout person operates the main energy isolation device removing power to the lift being taken out of service. Stored or residual energy (such as capacitors, springs, elevated machine members, hydraulic systems, air, or etc.) must be dissipated or restrained by methods such as grounding, repositioning, blocking, bleeding down, etc.

If this is a lockable device, the authorized lockout person places the assigned padlock on the device to prevent its unintentional reactivation. An appropriate tag is applied stating the person's name, at least 3" x 6" in size, an easily noticeably color, and states not to operate device or remove tag. If this device is a non-lockable circuit breaker or fuse, replace circuit with a "dummy" device and tag it appropriately as mentioned above.

4) Ensure that the equipment is disconnected from the energy sources' by first checking that no personnel are exposed, then verify the isolation of the equipment by operating the push button or other normal operating controls' or by testing to make certain the equipment will not operate. . Be sure to return any switches to the "OFF" position.

5) The equipment is now locked out and ready for the required maintenance or service.

 

Restoring Equipment to Service

1) Check the lift and the immediate area around the lift to ensure that nonessential items have been removed (clear all tools, vehicles and personnel) and that the completion of all lift components are operationally intact.

2) The authorized person can now remove the lock (or dummy circuit breaker or fuse) and tag. Activate the energy isolating device so that the lift may again be placed into operation.

 

Scan the QR code to read on your phone
We could not find any corresponding parameters, please add them to the properties table
  • TOP